To make sure your calendar, event reminders, and other features are always
correct, please tell us your time zone (and other details) using the
drop-down menus below:
Set Date/Time format:
In 12 Hour format the hours will be displayed as 1 through 12 with “a.m.” and “p.m.”
displayed after the time (ex. 1:00p.m.). In 24 hour format the hours will be displayed as 00 through 23 (ex. 13:00).
You can always change your time zone by going to your Account Settings.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Visiting Bruce Zhu(username: busbarbendingmachine)
Tag
Please wait...
Select a Color
Manage Applications
Check the items that you want displayed. Uncheck all to hide the section.
Calendars
Files
Addresses
To Dos
Discussions
Photos
Bookmarks
The “Switch Navigator” button will no longer be available after February 14, 2017.
Please learn more about how to use the new Navigator by clicking this link.
Simple failure analysis and solution of busbar processing machine
The cleaning method of the copper cutting machine is hot oil cleaning. Because of the long-term use, the bearing hardened by soft dry oil or anti-rust paste, clamp the bearing with pliers, and use a brush to clean the oil on the bearing. It is easy to wash in through the gap of the bearing. Sometimes it is only necessary to swing the bearing repeatedly in the oil. The oil will also flow away from the crevices. When cleaning the centripetal spherical bearing of the old busbar motor or imported motor, the balls, the bead frame, and the inner ring should be rotated laterally from the outer ring and then immersed in hot oil. The short cylindrical roller bearing should also be cleaned. Disconnect the rollers, bead holder, inner ring and outer ring. During hot oil cleaning, the temperature of the oil should not exceed 20°C. If you use an open flame to heat directly, you should pay attention to avoid burning the oil. The bearing should be hung in the oil pan. The sinking bottom will cause overheating and reduce the hardness. How to deal with the copper cutting machine in time after damp. Summary: Mainly introduce the safety operation of large power transformers due to the shortcomings of insulation coordination, as well as the analysis and prevention of insulation accidents.
Sudden damp accidents refer to accidents caused by splashing into the jelly bus processing machine or sucking in water. There are the following situations: the casing "general cap" is not tightly sealed, and the sucked water seeps into the coil along the high-voltage outlet line, causing it The high-voltage coil in the middle part of the wire is short-circuited between turns; when the vacuum is pumped, water is hit on the coil, and when the oil is filled, the water is washed on the coil, causing the coil to burn. Sudden damp dampness The whole insulation is damp, and as the oil circulates, the moisture accumulates to a certain extent in the insulation, causing an accident. Causes a ring-shaped discharge; the residual silica gel at the largest electric field will transfer to the turn insulation after absorbing water, which will cause the turn insulation to be locally damp, causing a short circuit between the turns. In short, when analyzing normal insulation accidents, the first thing to think about is insulation damp. Because the normal working voltage is very high, in addition to moisture, there are few elements that damage the insulation, which can make the withstand strength of the insulation unable to withstand the strength of the normal working voltage.
Normal oil paper is extremely high. Under normal operating voltage, it is impossible for the turn insulation to wear accidents; but the theoretical situation is that the possibility of transformer winding insulation accidents is due to the burning of the oil paper ring; the water cooler leaks. Causes the coil to burn out; the positioning nail rubber gasket on the top cover of the fuel tank is not tightly sealed, and the coil is burned; when the water is poured on the coil during installation, the transformer is damp during transportation, and the CNC copper bending machine is not found. The accumulated water was not washed away before, and the oil was injected from the upper part. The water mixed with the oil and poured on the body, causing insulation breakdown; the accumulated water in the oil storage tank was too low and decreased. The insulation of the portable bus bar processing machine can be divided into water inrush, which has great affinity, and its insulation strength will drop linearly after being damp.
Attach this document to an event, task, or address
You can attach a link to this document to an event in your Calendar, a task in your To Do list or an Address. Check the boxes below for the data you want to
bring into the event’s or task’s description, and then click “Select text to copy” to have the next event or task you create or edit have the document text and link.