To make sure your calendar, event reminders, and other features are always
correct, please tell us your time zone (and other details) using the
drop-down menus below:
Set Date/Time format:
In 12 Hour format the hours will be displayed as 1 through 12 with “a.m.” and “p.m.”
displayed after the time (ex. 1:00p.m.). In 24 hour format the hours will be displayed as 00 through 23 (ex. 13:00).
You can always change your time zone by going to your Account Settings.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Visiting Bruce Zhu(username: busbarbendingmachine)
Tag
Please wait...
Select a Color
Manage Applications
Check the items that you want displayed. Uncheck all to hide the section.
Calendars
Files
Addresses
To Dos
Discussions
Photos
Bookmarks
The “Switch Navigator” button will no longer be available after February 14, 2017.
Please learn more about how to use the new Navigator by clicking this link.
What matters should be paid attention to when installing the portable bus processing machine?
The portable bus processing machine is small in size, flexible, easy to carry, flexible and convenient to move, which is conducive to the use of electric power on-site operation. The convenience of movement, easy operation, and functional use are welcomed by manufacturers in the busbar machine manufacturing industry. The following matters need to be paid attention to in its installation.
During the installation of the portable bus processing machine, you need to pay attention to the preparations for fixing, because the equipment is movable. In order to ensure the stability of the operation, you need to pay attention to the preparations on the fixed components and block the moving wheels. It will not shake or move in the process of operation, and ensure the safety of operation. In order to ensure the convenience of the operation of the portable busbar bending machine, the height requirements also need to be paid attention to during the installation process. It is also necessary to ensure the convenience in cleaning. Do not install it with equipment that requires relatively high hygiene. May produce debris, resulting in dirt.
In the moving range of the material, avoid obstacles to avoid accidents. The equipment placement space should be able to carry out maintenance, repairs and other operations. Do not install near dust-generating machines such as grinders, or places where dust is generated. Keep away from noisy machines such as welding machines, drilling machines, grinders, and grinders. For the installation of the portable bus bar machine, the preparation on the special plug is also necessary. It is necessary to prepare a professional socket. Although the equipment is not particularly large in electric power, in order to ensure the safety in use, it is necessary to install a safe three-pin socket. Be sure to achieve a reliable protective grounding and avoid placing it next to high-current equipment. The precautions for the installation of the portable bus processing machine can ensure the smooth use and normal function in the future, and meet the needs of the processing effect.
Attach this document to an event, task, or address
You can attach a link to this document to an event in your Calendar, a task in your To Do list or an Address. Check the boxes below for the data you want to
bring into the event’s or task’s description, and then click “Select text to copy” to have the next event or task you create or edit have the document text and link.