To make sure your calendar, event reminders, and other features are always
correct, please tell us your time zone (and other details) using the
drop-down menus below:
Set Date/Time format:
In 12 Hour format the hours will be displayed as 1 through 12 with “a.m.” and “p.m.”
displayed after the time (ex. 1:00p.m.). In 24 hour format the hours will be displayed as 00 through 23 (ex. 13:00).
You can always change your time zone by going to your Account Settings.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Visiting Brian Lowenthal(username: athomehandyman)
Tag
Please wait...
Select a Color
Manage Applications
Check the items that you want displayed. Uncheck all to hide the section.
Calendars
Files
Addresses
To Dos
Discussions
Photos
Bookmarks
The “Switch Navigator” button will no longer be available after February 14, 2017.
Please learn more about how to use the new Navigator by clicking this link.
to do
1. Demo existing bathroom shower walls, tub, vanities, floors, walls and ceiling. A complete gut and repair any areas if needed that have been previously damaged. Cap plumbing in existing shower area and rebuild to support new plumbing and wall work. Insulate exterior walls and ceiling if needed, run new electrical as discussed, adding a shower fan/light combo kit, add (3) 6” can and new vanity light and all switching. Replacing all switches and outlets and make outlet GFCI. We will run exhaust fan exhaust duct‐line to exterior soffit of house to meet code. 2. All plumbing will be checked after demolition and if needed the shut off valves for the toilet and vanity will be plumbed for replacement if damaged. 3. New sheetrock and durarock will be installed on the walls 4. All rough plumbing, rough electrical, trim, finishing and painting are included 5. We will provide a new custom built vanity’s for the master bathroom and a new makeup area. No towers will be installed on the master bathroom vanity or in the master closet. The existing toilet room vanity will remain and just will be refaced with new draws and door fronts, painted and the existing mirror will be removed. Contractor to provide granite counter top and 4” backsplash up to $55.00 per square foot allowance. 7. All trim work is included. 8. Floor protection, clean up, disposal and removal of trash are included.
Attach this document to an event, task, or address
You can attach a link to this document to an event in your Calendar, a task in your To Do list or an Address. Check the boxes below for the data you want to
bring into the event’s or task’s description, and then click “Select text to copy” to have the next event or task you create or edit have the document text and link.